LNG Road tanker, Kwinana, WA |
Wesfarmers LNG PTY LTD |
4 off 55,000L @ 8bar LNG Road tankers. |
Oct 2018 |
LNG Road tanker, Kwinana, WA |
Wesfarmers LNG PTY LTD |
2 off 55,000L @ 8bar LNG Road tankers. |
Jun 2018 |
CO2, QLD |
Stanbroke |
1 off 50,000L @ 22bar Vertical CO2 Storage Tank. 1 off Ambient Air Vaporizers (AAV). |
Jan 2017 |
Freeport LNG |
CCZJV |
Vacuum Jacketed Piping for Freeport Liquefaction Train 3. |
2016-2017 |
SF6 Recovery System |
ABB |
Triple Layered Cryogenic Tank with Internal Heat Exchanger and Storage Tank. |
2016 |
Cameron LNG |
CCJV |
Vacuum Jacketed Piping for LNG plant |
2015-2017 |
Freeport LNG |
CZJV |
Vacuum Jacketed Piping and Field Joint Installation for LNG plant |
2015-2017 |
Scarborough FLNG FEED |
NK (Korea) / Hyundai |
FEED – Engineering consultation and design development of LNG refrigerant storage systems for Floating LNG. 4 x 1,250m3 IGC Type C. |
2015-2016 |
LNG Regas Plant (EPC) Stage 1 |
Myanmar / Thailand |
LNG Receiving Terminal and Regasification Plant, including VIP (from FSU), storage tanks, vaporizers, pumps, plant control systems and gas send-out to power plants. Stage 1(35mmscfd). 4 stages total. |
2015-2017 |
Cameron |
CB&I / Chiyoda |
2 x 330m3 Ethylene Bullets – LNG refrigerants |
Est. Feb 2016 |
Mini LNG Plant (EPC) Stage 1 |
Mineral Resources (Australia) |
15 TPD LNG – Western Australia 7 x 60 m3 LNG storage tanks, 50m3 Road Tanker, 1 mmscfd Ambient Air Vaporizers (AAV), Control and Process System – EPC. |
Oct 2014 – Mid 2015 |
APLNG |
Bechtel / ConocoPhilips |
Ethylene ISO Containers (28 off). |
Dec 2015 |
CO2 Tanks |
BOC |
4 off 475,000L @ 22 bar, Horizontal. |
Dec 2014 |
GLNG |
Bechtel / Santos |
Ethylene ISO Containers (56 off). |
Oct 2014 |
DLNG |
ConocoPhilips / Worley Parsons |
Vacuum Insulated Piping, Modification during shutdown. |
Sep 2014 |
APLNG |
Bechtel |
Customer pipe spool modification. |
Mar 2014 |
GLNG |
Bechtel / Santos |
Ethylene Storage Tanks (3 x 280kL). |
Jun 2013 |
Road Tanker LOX |
Air Liquide |
Tri-axle Type, Custom-Design. |
Jun 2013 |
APLNG |
Bechtel / |
Vacuum Insulated Piping, 8” to 60” dia. Core Pipes, 4km for LNG plants. |
Aug 2013 |
APLNG |
Bechtel / |
Ethylene Storage Tanks (2 x 288kL). |
Sept 2013 |
QCLNG |
Bechtel / BG |
Vacuum Insulated Piping, 6” to 48” dia. Core Pipes, 3.8km for LNG plants. |
Mar 2012 |
QCLNG |
Bechtel / BG |
Ethylene Storage Tanks (4 x 285kL), ASME-U Stamp. |
Dec 2011 |
Road Tankers LNG |
Wesfarmer/Kleenheat |
Tri-axle type, 45kL LNG Custom-Design. |
Dec 2011 |
Methane Hydrate Experimental Rig Design |
ANSTO / CSIRO |
Closed-loop Methane Gas Circulation System at 20MPa. Featuring Water Injection for Methane Hydrate Forming Experiment Using Neutron Scattering (From Nuclear Reactor). |
Jun 2010 |
Nuclear Liquid |
Australian Nuclear Science & Technology Organisation. |
4 off 7,000L Tanks for Mo-99 Radioactive Liquid Waste Storage Tanks. |
May 2010 |
Design Verification |
CSIRO |
200kW Solar Energy Process Equipment |
May 2010 |
SF6 Recovery |
ABB |
Concept Development to Product Realisation. Triple Layered Cryogenic Tanks with Internal Heat Exchanger. R&D Project |
May 2010 |
Static Cryogenic |
BOC, Air Liquide, |
Over 60 off, Ranging from 3,000L to 300,000L, and 17bar to 35bar. LIN / LOX / LAR / CO2 / LNG. |
On-going |
Repairs / Refurbishment |
Various customers |
Road tankers, ISO containers and storage tanks. |
On-going |
ISO Containers, |
BOC |
CSC / IMDG / ADR / RID / TIR / UN Approved for International Transportation of Dangerous Goods. |
Jan 2010 |
CO2, WA |
BOC / CP Mining |
1 off 215,000L @ 23bar Horizontal CO2 Storage Tank. |
Jun 2010 |
Micro LNG Plant |
BOC |
2 off 300,000L @ 7bar, Vertical LNG Tanks, 30m tall. |
Mar 2010 |
Pluto LNG, WA |
BOC / Woodside |
3 off 185,000L @ 9bar, Horizontal Liquid Nitrogen (LIN) Storage Tanks. |
Dec 2009 |